Calidus B-250: UAE turboprop light attack and training aircraft

Calidus B-250: UAE turboprop light attack and training aircraft

Photo: Mztourist / Wikimedia Commons / CC BY-SA 4.0

United Arab EmiratesLight attack and trainer aircraftIn development

Two-seat composite turboprop built in Al Ain, designed with Brazil's Novaer

The B-250 is a two-seat turboprop light attack, close air support, ISR and training aircraft produced by Calidus in Al Ain, Abu Dhabi. Designed by Brazil's Novaer for Calidus, it has been ordered by the UAE Air Force and is in development, with certification of the B-250LA aimed for 2027.

350 KTASMax speed
up to 10-12 hEndurance
30,000 ftService ceiling
< USD 1,200 per flight hourOperating cost
24 aircraft, AED 2.27 billionUAE order (2019)

What is the Calidus B-250? Overview and development history

Calidus unveiled the B-250 at the Dubai Airshow on 16 November 2017. Defense News reports that it was designed by the Brazilian firm Novaer for Calidus, which handles production in the UAE, so the aircraft is a co-developed design. Calidus nonetheless describes it as the first aircraft made in the UAE on local intellectual property.

Turboprop light attack aircraft are generally used for close air support, armed reconnaissance and training in low-threat airspace, where their endurance and lower running costs compared with jets are an advantage. The B-250 was conceived to cover several of these roles in one airframe.

The type was shown at the Bahrain International Airshow in 2018 and at IDEX in February 2019, and two flying prototypes appeared at the 2019 Dubai Airshow. On 20 November 2019 the UAE ordered 24 aircraft for AED 2.273 billion (about USD 620 million). This was described as the first time the UAE military had bought a domestically produced aircraft. Janes reported a further order for 12 aircraft from the UAE Air Force and Air Defence at IDEX 2021.

B-250 design, avionics and weapons

The pilot and weapons systems officer sit in tandem in a pressurised cockpit on Martin-Baker zero-zero ejection seats. The airframe is built from carbon-fibre composite and powered by a Pratt & Whitney Canada PT6A-68 turboprop. Collins Pro Line Fusion avionics provide a digital head-up display and touchscreen displays, and the landing gear is reinforced for unprepared strips.

Maximum speed is 350 KTAS and the B-250LA cruises at about 520 km/h. The service ceiling is 30,000 ft and maximum range is 2,400 nm. Endurance figures differ: Defense News quoted up to 10 hours in 2019, while Calidus gives up to 12 hours depending on the mission. Calidus quotes an operating cost of under USD 1,200 per flight hour.

Weapons cleared or planned for the underwing and centreline stations include UAE-made DESERT STING 16 glide bombs, THUNDER P-32 guided bombs and the ALHEDA anti-tank missile.

B-250 programme status, variants and production

In November 2023 Calidus and the UAE Air Force signed a letter of intent for 40 B-250T trainers with simulators and part-task trainers, and deliveries were expected from mid-2026. Janes reported at IDEX 2025 that this trainer contract had not been finalised.

The production-standard B-250LA, which has a longer wing, made its first flight on 2 November 2025. Three prototypes then entered a test campaign running to the end of 2026, aimed at certification in 2027. Calidus intends to build one aircraft a month at Al Ain, with first deliveries expected in 2028-29. The UAE is listed as having ordered the aircraft.

B-250 specifications: engine, performance, avionics and weapons

Crew2 in tandem (pilot + weapons systems officer)
EnginePratt & Whitney Canada PT6A-68 turboprop
StructureCarbon-fibre composite airframe, pressurised cockpit
Ejection seatsMartin-Baker zero-zero
AvionicsCollins Pro Line Fusion with digital HUD and touchscreen displays
Max speed350 KTAS
Cruise speed (B-250LA)About 520 km/h
Service ceiling30,000 ft
Max range2,400 nm
EnduranceUp to 12 h depending on mission
Weapons cleared/plannedDESERT STING 16, THUNDER P-32, ALHEDA anti-tank missile on underwing and centreline stations
Landing gearReinforced for unprepared strips

B-250 variants: B-250LA and B-250T

B-250LALight attack production version with a longer wing; first flight on 2 November 2025.
B-250TTrainer version, 40 of which the UAE Air Force has said it intends to buy (letter of intent, November 2023).

How did the B-250 come to be? Development and industrial background

The B-250 was unveiled at the Dubai Airshow on 16 November 2017. Defense News reports that the Brazilian firm Novaer designed the aircraft for Calidus, which handles production in the UAE. That makes the B-250 a co-developed design, although Calidus calls it the first aircraft made in the UAE on local intellectual property.

Before orders arrived, the aircraft toured the show circuit: the Bahrain International Airshow in 2018, IDEX in February 2019, and the 2019 Dubai Airshow, where two flying prototypes appeared.

Where is the B-250 produced? Manufacturer, partners and local content

Calidus is an Abu Dhabi aerospace and defence company with an aircraft production facility in Al Ain. The B-250 is its main aircraft programme, and the company also makes the MCAV-20 armoured vehicle and the WAHASH IFV.

Aerospace Global News reported in 2025 that Calidus aims to produce one aircraft a month at Al Ain, with first deliveries expected in 2028-29. The aircraft carries foreign-made major components, including a Pratt & Whitney Canada PT6A-68 engine and Collins avionics, while the weapons cleared for it include UAE-made DESERT STING 16, THUNDER P-32 and ALHEDA.

Who has ordered or tested the B-250? Orders, trials and service plans

The UAE is listed as having ordered the aircraft. On 20 November 2019 it ordered 24 B-250s for AED 2.273 billion (about USD 620 million), described as the first time the UAE military bought a domestically produced aircraft. Janes reported 12 more ordered by the UAE Air Force and Air Defence at IDEX in February 2021.

In November 2023 Calidus and the UAE Air Force signed a letter of intent for 40 B-250T trainers with simulators and part-task trainers, with deliveries expected from mid-2026. Janes reported at IDEX 2025 that the trainer contract had not been finalised. The aircraft is not yet in service.

B-250LA test campaign and certification outlook

The production-standard B-250LA has a longer wing and made its maiden flight on 2 November 2025, according to Aerospace Global News. Three prototypes then entered a test campaign running to the end of 2026, aimed at certification in 2027.

The timeline shows how far the programme has to run. Janes reported in February 2025 that the first production-standard aircraft was set to fly that year. Taken with the 2028-29 delivery expectation, the dates imply a gap of several years between the 2019 order and first deliveries. Endurance figures also differ by source, from up to 10 hours (Defense News, 2019) to up to 12 hours (Calidus).

B-250 timeline: key dates from unveiling to the B-250LA first flight

  1. 16 November 2017Calidus unveils the B-250 at the Dubai Airshow.
  2. 2018The B-250 is displayed at the Bahrain International Airshow.
  3. February 2019The B-250 is displayed at IDEX.
  4. 20 November 2019The UAE orders 24 B-250s for AED 2.273 billion at the Dubai Airshow.
  5. February 2021The UAE Air Force and Air Defence order 12 more aircraft, according to Janes.
  6. November 2023Calidus and the UAE Air Force sign a letter of intent for 40 B-250T trainers.
  7. February 2025Janes reports the first production-standard aircraft set to fly in 2025 and the trainer contract not yet finalised.
  8. 2 November 2025The B-250LA makes its maiden flight.

Which countries use the B-250?

United Arab EmiratesOrdered

About Calidus: who builds the B-250

Calidus

Calidus is an Abu Dhabi aerospace and defence company with an aircraft production facility in Al Ain. The B-250 is its main aircraft programme, designed by Brazil's Novaer for Calidus and produced in the UAE. The company also makes the MCAV-20 armoured vehicle and the WAHASH IFV. Calidus aims to produce one B-250 a month at Al Ain, with first deliveries expected in 2028-29.

Calidus B-250 FAQ: origin, performance and orders

What is the Calidus B-250?

The B-250 is a two-seat turboprop for light attack, close air support, ISR and training, built by Calidus in Al Ain, Abu Dhabi.

Who designed the B-250?

Defense News reports it was designed by Brazil's Novaer for Calidus, which produces it in the UAE. It is therefore a co-developed design.

How fast is the B-250?

Maximum speed is 350 KTAS, and the B-250LA cruises at about 520 km/h. The service ceiling is 30,000 ft.

What engine does the B-250 use?

A Pratt & Whitney Canada PT6A-68 turboprop.

How many B-250s has the UAE ordered?

The UAE ordered 24 in 2019 and, according to Janes, 12 more in 2021. A letter of intent for 40 B-250T trainers was signed in 2023 but had not been finalised by early 2025.

When will the B-250 enter service?

The B-250LA first flew on 2 November 2025, certification is targeted for 2027 and first deliveries are expected in 2028-29.

Who designed the B-250?

Defense News reports that the Brazilian firm Novaer designed the B-250 for Calidus, which produces it in the UAE. Calidus calls it the first aircraft made in the UAE on local intellectual property.

When was the B-250 unveiled?

The B-250 was unveiled at the Dubai Airshow on 16 November 2017.

Where is the B-250 built?

The B-250 is built by Calidus at its aircraft production facility in Al Ain, UAE.

What is the B-250LA?

The B-250LA is the light attack production version of the B-250 with a longer wing. It made its first flight on 2 November 2025.

What is the B-250T?

The B-250T is the trainer version of the B-250. The UAE Air Force said in a November 2023 letter of intent that it intends to buy 40, with simulators and part-task trainers.

How many B-250 aircraft has the UAE ordered?

The UAE ordered 24 B-250s in November 2019 for AED 2.273 billion, and Janes reported 12 more ordered in February 2021.

When will the B-250 be certified?

Calidus plans a test campaign with three prototypes through the end of 2026, aimed at certification in 2027, according to Aerospace Global News.

What weapons can the B-250 carry?

Weapons cleared or planned for the B-250 include UAE-made DESERT STING 16 glide bombs, THUNDER P-32 guided bombs and the ALHEDA anti-tank missile.

Sources and further reading

  1. defensenews.com/digital-show-dailies/dubai-air-show/2019/11/20/calidus-inks-its-first-b-250-light-attack-plane-order/
  2. janes.com/defence-intelligence-insights/defence-news/air/idex-2025-calidus-b-250-turboprop-set-for-first-flight
  3. breakingdefense.com/2023/11/uae-air-force-makes-first-order-for-emirati-firm-caliduss-b250-trainer-aircraft-ceo/
  4. aerospaceglobalnews.com/news/calidus-b250la-debut-dubai-airshow/
  5. wam.ae/en/article/15vlvnr-calidus-launches-b-250-light-attack-aircraft-fully
  6. globalsecurity.org/military/world/gulf/b-250.htm

Related products

Related Posts