Qatar’s cadet training ships Al Doha and Al Shamal
Deal progress
Current status: Delivered — latest milestone in 2021. Not every deal goes through every stage; a government sale approval, for example, applies only in some supplier countries.
Deal details
Qatar is acquiring the cadet training ships Al Doha and Al Shamal from Türkiye, with Anadolu Shipyard (ADIK) named as the manufacturer. It is classed under naval vessels. The announced quantity is 2 ships, and no value has been disclosed.
The deal has reached the delivery or in-service stage, with its most recent major milestone in 2021.
Details: The first ship was delivered in August 2021.
What are the training ships Al Doha and Al Shamal?
These are two training ships for naval academy cadets, built by Turkey’s Anadolu Shipyard (ADIK) in Istanbul for the Qatari Emiri Naval Forces under a programme whose contract was signed at DIMDEX 2018 in Doha. The first, Al Doha (QTS 91), was delivered on 25 August 2021 after about 30 months of work under pandemic conditions, while the second, Al Shamal (QTS 92), was launched on 20 December 2020 and entered service in February 2022.
The yard based the design on one of its own offshore patrol vessels (OPV), with a high-tensile steel hull and an aluminium superstructure to save weight. Each ship is 89.6 m long and 14.2 m wide.
Design and role
The training role shows clearly in the internal layout. Each ship has two complete bridges, so two groups of cadets can practise navigation and ship handling at the same time. There is room for 76 cadets and 8 instructors, alongside a permanent crew of 60 sailors and 6 civilians. The curriculum covers combat management and weapons handling: each ship carries a 30 mm gun forward with an electro-optical fire control system, two 12.7 mm machine guns, and two X-band and one S-band navigation radars.
The ships are not limited to training; they are also fitted for secondary surveillance and armed patrol duties. The flight deck aft can take a helicopter of up to 11 tonnes. Top speed is 22 knots and sustained cruising speed 18 knots, range exceeds 2000 nautical miles, and the ships can stay at sea for 15 days without refuelling. The yard later also built a large landing ship for the Qatari navy.
Key specifications
| Role | Naval cadet training, with secondary surveillance and patrol duties |
|---|---|
| Manufacturer | Anadolu Shipyard (ADIK), Turkey |
| Delivery | Al Doha: August 2021; Al Shamal: February 2022 |
| Length | 89.6 m |
| Beam | 14.2 m |
| Maximum speed | 41 km/h (22 knots) |
| Range | More than 3700 km (2000 nautical miles) |
| Training capacity | 76 cadets and 8 instructors |
| Armament | 30 mm gun and two 12.7 mm machine guns |


